Conclusion
The main objective of this project was proposing alternative design solutions of the existing Al-Sleimi Bridge in Al Ain city. The scope of this project only considered superstructure components that include structural parts which can be seen above the supports. The full analysis and design for both slab bridge and box girder alternatives were developed by AASHTO LRFD and specifications.